Prompt: Work on the building's foundation commenced in August 1970. Contractors excavated the lot to a depth of 50 feet (15 m), and they removed 180,000 cubic feet (5,100 m3) of dirt from the site.[25] By that November, Spencer, White & Prentis Inc. was excavating a trench around the site, measuring 60 feet (18 m) deep and 20 by 216 feet (6.1 by 65.8 m) across. The contractors then built a slurry wall within the trench, made of concrete and reinforced steel.[26] Workers used steel bracing to prevent the slurry wall from collapsing inward, then used caissons to drill 201 holes into the ground. They also rerouted a sewer that had run underneath Quincy Street, which was to be closed permanent as part of the tower's construction.[25]
Prompt: Work on the building's foundation commenced in August 1970. Contractors excavated the lot to a depth of 50 feet (15 m), and they removed 180,000 cubic feet (5,100 m3) of dirt from the site.[25] By that November, Spencer, White & Prentis Inc. was excavating a trench around the site, measuring 60 feet (18 m) deep and 20 by 216 feet (6.1 by 65.8 m) across. The contractors then built a slurry wall within the trench, made of concrete and reinforced steel.[26] Workers used steel bracing to prevent the slurry wall from collapsing inward, then used caissons to drill 201 holes into the ground. They also rerouted a sewer that had run underneath Quincy Street, which was to be closed permanent as part of the tower's construction.[25]
Would you like to report this Dream as inappropriate?
Prompt:
Work on the building's foundation commenced in August 1970. Contractors excavated the lot to a depth of 50 feet (15 m), and they removed 180,000 cubic feet (5,100 m3) of dirt from the site.[25] By that November, Spencer, White & Prentis Inc. was excavating a trench around the site, measuring 60 feet (18 m) deep and 20 by 216 feet (6.1 by 65.8 m) across. The contractors then built a slurry wall within the trench, made of concrete and reinforced steel.[26] Workers used steel bracing to prevent the slurry wall from collapsing inward, then used caissons to drill 201 holes into the ground. They also rerouted a sewer that had run underneath Quincy Street, which was to be closed permanent as part of the tower's construction.[25]
Modifiers:
elegant
extremely detailed
intricate
oil on canvas
photorealistic
beautiful
high detail
dynamic lighting
hyperrealistic
high definition
crisp quality
coherent
serene
graceful
4k HDR
Dream Level: is increased each time when you "Go Deeper" into the dream. Each new level is harder to achieve and
takes more iterations than the one before.
Rare Deep Dream: is any dream which went deeper than level 6.
Deep Dream
You cannot go deeper into someone else's dream. You must create your own.
Deep Dream
Currently going deeper is available only for Deep Dreams.