Prompt: Construction of the stadium proceeded in several distinct phases, the first phase involving the construction of a concrete supporting structure upon the concrete foundations laid for the construction site. This was followed by the phased installation of the curved steel frame surrounding the stadium, which is largely self-supporting. This phased installation involved the interconnection of sections of the curved steel frame that were constructed in Shanghai and transported to Beijing for assembly and welding. The entire structure of interconnected sections was welded together as the primary means of interconnection used to assemble the entire surrounding nest structure. Upon removal of the supporting columns used for the purpose of expediting the assembly of the interconnecting sections, the completed nest structure as a whole settled approximately 27 cm to attain full stability before the interior design and construction of the stadium could be installed and completed.
Prompt: Construction of the stadium proceeded in several distinct phases, the first phase involving the construction of a concrete supporting structure upon the concrete foundations laid for the construction site. This was followed by the phased installation of the curved steel frame surrounding the stadium, which is largely self-supporting. This phased installation involved the interconnection of sections of the curved steel frame that were constructed in Shanghai and transported to Beijing for assembly and welding. The entire structure of interconnected sections was welded together as the primary means of interconnection used to assemble the entire surrounding nest structure. Upon removal of the supporting columns used for the purpose of expediting the assembly of the interconnecting sections, the completed nest structure as a whole settled approximately 27 cm to attain full stability before the interior design and construction of the stadium could be installed and completed.
Would you like to report this Dream as inappropriate?
Prompt:
Construction of the stadium proceeded in several distinct phases, the first phase involving the construction of a concrete supporting structure upon the concrete foundations laid for the construction site. This was followed by the phased installation of the curved steel frame surrounding the stadium, which is largely self-supporting. This phased installation involved the interconnection of sections of the curved steel frame that were constructed in Shanghai and transported to Beijing for assembly and welding. The entire structure of interconnected sections was welded together as the primary means of interconnection used to assemble the entire surrounding nest structure. Upon removal of the supporting columns used for the purpose of expediting the assembly of the interconnecting sections, the completed nest structure as a whole settled approximately 27 cm to attain full stability before the interior design and construction of the stadium could be installed and completed.
Modifiers:
elegant
extremely detailed
intricate
oil on canvas
photorealistic
beautiful
high detail
dynamic lighting
hyperrealistic
high definition
crisp quality
coherent
serene
graceful
4k HDR
Dream Level: is increased each time when you "Go Deeper" into the dream. Each new level is harder to achieve and
takes more iterations than the one before.
Rare Deep Dream: is any dream which went deeper than level 6.
Deep Dream
You cannot go deeper into someone else's dream. You must create your own.
Deep Dream
Currently going deeper is available only for Deep Dreams.