Prompt: Construction on the main phase of the museum began in early 2013 by a consortium headed by Arabtec, Constructora San José and Oger Abu Dhabi, under a $653 million contract. This stage included waterproofing and the two basement levels, along with four concrete pillars that will support the 7,000-tonne dome.[29] Work on the construction of the gallery spaces and initial preparation for the dome began in the fourth quarter of 2013. On 5 December 2013, the first element of the museum's canopy was lifted into place.[30] On 17 March 2014 TDIC announced the completion of the first permanent gallery structure to mark the first anniversary of the start of construction. At this time, it was claimed that a total of ten million man hours had been worked and 120,538 cubic meters of concrete used.[31] On 22 September 2014, the final super-sized element in the canopy was fitted in place, marking a significant milestone in the museum's construction phase. In October, The Tourism & Development Investment Company announced that the Louvre Abu Dhabi was more than 50 percent complete.[32]
Prompt: Construction on the main phase of the museum began in early 2013 by a consortium headed by Arabtec, Constructora San José and Oger Abu Dhabi, under a $653 million contract. This stage included waterproofing and the two basement levels, along with four concrete pillars that will support the 7,000-tonne dome.[29] Work on the construction of the gallery spaces and initial preparation for the dome began in the fourth quarter of 2013. On 5 December 2013, the first element of the museum's canopy was lifted into place.[30] On 17 March 2014 TDIC announced the completion of the first permanent gallery structure to mark the first anniversary of the start of construction. At this time, it was claimed that a total of ten million man hours had been worked and 120,538 cubic meters of concrete used.[31] On 22 September 2014, the final super-sized element in the canopy was fitted in place, marking a significant milestone in the museum's construction phase. In October, The Tourism & Development Investment Company announced that the Louvre Abu Dhabi was more than 50 percent complete.[32]
Would you like to report this Dream as inappropriate?
Prompt:
Construction on the main phase of the museum began in early 2013 by a consortium headed by Arabtec, Constructora San José and Oger Abu Dhabi, under a $653 million contract. This stage included waterproofing and the two basement levels, along with four concrete pillars that will support the 7,000-tonne dome.[29] Work on the construction of the gallery spaces and initial preparation for the dome began in the fourth quarter of 2013. On 5 December 2013, the first element of the museum's canopy was lifted into place.[30] On 17 March 2014 TDIC announced the completion of the first permanent gallery structure to mark the first anniversary of the start of construction. At this time, it was claimed that a total of ten million man hours had been worked and 120,538 cubic meters of concrete used.[31] On 22 September 2014, the final super-sized element in the canopy was fitted in place, marking a significant milestone in the museum's construction phase. In October, The Tourism & Development Investment Company announced that the Louvre Abu Dhabi was more than 50 percent complete.[32]
Modifiers:
elegant
extremely detailed
intricate
oil on canvas
photorealistic
beautiful
high detail
dynamic lighting
hyperrealistic
high definition
crisp quality
coherent
serene
graceful
4k HDR
Dream Level: is increased each time when you "Go Deeper" into the dream. Each new level is harder to achieve and
takes more iterations than the one before.
Rare Deep Dream: is any dream which went deeper than level 6.
Deep Dream
You cannot go deeper into someone else's dream. You must create your own.
Deep Dream
Currently going deeper is available only for Deep Dreams.