Prompt: The Seattle Central Library is the flagship library of the Seattle Public Library system. The 11-story (185 feet or 56.9 meters high) glass and steel building in downtown Seattle, Washington was opened to the public on May 23, 2004. Rem Koolhaas and Joshua Prince-Ramus of OMA/LMN were the principal architects, and Magnusson Klemencic Associates was the structural engineer with Arup. Arup also provided mechanical, electrical, and plumbing engineering, as well as fire/life safety, security, IT and communications, and audio visual consulting. Hoffman Construction Company of Portland, Oregon, was the general contractor. The 362,987 square feet (33,722.6 m2) public library has the capacity to hold about one and a half million books and other materials. It offers underground public parking for 143 vehicles and over 400 computers accessible to the public. Over two million people visited the library during its first year. It is the third Seattle Central Library building to be located on the same site at 1000 Fourth Avenue, the block bounded by Fourth and Fifth Avenues and Madison and Spring Streets.
Prompt: The Seattle Central Library is the flagship library of the Seattle Public Library system. The 11-story (185 feet or 56.9 meters high) glass and steel building in downtown Seattle, Washington was opened to the public on May 23, 2004. Rem Koolhaas and Joshua Prince-Ramus of OMA/LMN were the principal architects, and Magnusson Klemencic Associates was the structural engineer with Arup. Arup also provided mechanical, electrical, and plumbing engineering, as well as fire/life safety, security, IT and communications, and audio visual consulting. Hoffman Construction Company of Portland, Oregon, was the general contractor. The 362,987 square feet (33,722.6 m2) public library has the capacity to hold about one and a half million books and other materials. It offers underground public parking for 143 vehicles and over 400 computers accessible to the public. Over two million people visited the library during its first year. It is the third Seattle Central Library building to be located on the same site at 1000 Fourth Avenue, the block bounded by Fourth and Fifth Avenues and Madison and Spring Streets.
Would you like to report this Dream as inappropriate?
Prompt:
The Seattle Central Library is the flagship library of the Seattle Public Library system. The 11-story (185 feet or 56.9 meters high) glass and steel building in downtown Seattle, Washington was opened to the public on May 23, 2004. Rem Koolhaas and Joshua Prince-Ramus of OMA/LMN were the principal architects, and Magnusson Klemencic Associates was the structural engineer with Arup. Arup also provided mechanical, electrical, and plumbing engineering, as well as fire/life safety, security, IT and communications, and audio visual consulting. Hoffman Construction Company of Portland, Oregon, was the general contractor. The 362,987 square feet (33,722.6 m2) public library has the capacity to hold about one and a half million books and other materials. It offers underground public parking for 143 vehicles and over 400 computers accessible to the public. Over two million people visited the library during its first year. It is the third Seattle Central Library building to be located on the same site at 1000 Fourth Avenue, the block bounded by Fourth and Fifth Avenues and Madison and Spring Streets.
Modifiers:
elegant
extremely detailed
intricate
oil on canvas
photorealistic
beautiful
high detail
dynamic lighting
hyperrealistic
high definition
crisp quality
coherent
serene
graceful
4k HDR
Dream Level: is increased each time when you "Go Deeper" into the dream. Each new level is harder to achieve and
takes more iterations than the one before.
Rare Deep Dream: is any dream which went deeper than level 6.
Deep Dream
You cannot go deeper into someone else's dream. You must create your own.
Deep Dream
Currently going deeper is available only for Deep Dreams.